An electrical rough-in is the stage of construction where the electrician installs everything that will be hidden in the walls, ceilings and floors, before insulation and drywall go up. That means the boxes, the wire runs, the panel and service, and the connections between them. The work then has to pass a rough electrical inspection before the walls can be closed.
Talk to Our New Construction TeamThe electrician sets boxes for every receptacle, switch, light and appliance, then drills framing and pulls cable to each one. Dedicated circuits get run for the kitchen, laundry, HVAC, water heater, garage and any EV charger. The panel is set and the circuits are made up in the boxes, ready for devices later. On a typical new home this takes several days.
In Colorado, the local building department or the State Electrical Board inspects the rough-in before insulation. Depending on the address, that is the City of Brighton, Adams County, Weld County, Denver or another local building department. The inspector checks box fill, wire size, stapling and protection, circuit layout, and grounding. Nothing gets covered until it passes.
After rough inspection, insulation and drywall go in. The electrician then returns for trim out, installing receptacles, switches, fixtures and breakers. Final inspection and utility power come after that. Changes are cheapest during rough-in, so it is the right time to add outlets, lighting or EV and solar prep.